About Us   Forums   Contact   Sitemap  
Username:
Password:

Home ›› Media ›› Photo Galleries ›› 2005 ›› Build Season - Week Three ›› 2005 Build Season - Week Three

Photo: 2005 Build Season - Week Three

2005 Build Season - Week Three

Previous

Next

Download Image:
+ Medium Size (Screen)
+ High Resolution (Original)

You are currently viewing photo 22 of 37 in the Build Season - Week Three photo gallery.

In this picture, Ben was dry fitting the elevator onto the robot. The elevator on our 2005 robot was a single-stage design, and used linear bearings combined with the slots in 80/20 extrusion to create an elevator. Spectra cable was used to lift and lower the elevator. A single motor Fisher-Price transmission was used to power the elevator.

Download the highest-resolution version of this photo.

Photo Information:

Name: 2005 Build Season - Week Three
Size: 718.1 kb • 1704x2272
Date: January 29, 2005
Views: 97
Tags: elevatorrobotgus7benpiecuchgordonmorrison2005buildseasonweekthree

Embed this Photo:

By using the HTML or BB (Bulletin Board) code snippets available below, you can post this image into your blog or forum. Typically when posting images in web forums, such as Chief Delphi, you need to use BB code.

HTML:
<a href="http://www.team228.org/media/pictures/view/917" title="2005 Build Season - Week Three"><img src="http://www.team228.org/gallery/23/slideshow/bds-22.jpg" alt="2005 Build Season - Week Three" /></a>
BB:
[URL=http://www.team228.org/media/pictures/view/917][IMG]http://www.team228.org/gallery/23/slideshow/bds-22.jpg[/IMG][/URL]
Launch Slideshow of this Gallery

Watch a slideshow of the photos from this gallery!

Search:

Search our photo galleries:

Jump to: