About Us   Forums   Contact   Sitemap  
Username:
Password:

Home ›› Media ›› Photo Galleries ›› 2006 ›› Build Season, Week Six ›› Gus 8 under construction

Photo: Gus 8 under construction

Gus 8 under construction

Previous

Next

Download Image:
+ Medium Size (Screen)
+ High Resolution (Original)

You are currently viewing photo 57 of 99 in the Build Season, Week Six photo gallery.

The ball spiral, ball intake, and drive train sub-systems on our 2006 robot have been more or less completed and are ready to roll. Still awaiting the huge "Done!" stamp (a la Monster House) are the shooter, turret, and center ball elevator.

Download the highest-resolution version of this photo.

Photo Information:

Name: Gus 8 under construction
Size: 707.5 kb • 1704x2272
Date: February 18, 2006
Views: 79
Tags: gus8robotballspiralballintakedrivetrainweeksixbuildseason2006

Embed this Photo:

By using the HTML or BB (Bulletin Board) code snippets available below, you can post this image into your blog or forum. Typically when posting images in web forums, such as Chief Delphi, you need to use BB code.

HTML:
<a href="http://www.team228.org/media/pictures/view/1940" title="Gus 8 under construction"><img src="http://www.team228.org/gallery/46/slideshow/bds-57.jpg" alt="Gus 8 under construction" /></a>
BB:
[URL=http://www.team228.org/media/pictures/view/1940][IMG]http://www.team228.org/gallery/46/slideshow/bds-57.jpg[/IMG][/URL]
Launch Slideshow of this Gallery

Watch a slideshow of the photos from this gallery!

Search:

Search our photo galleries:

Jump to: