Photo: 2005 Build Season - Week Six - Robot Arm and Elevator
Previous |
Next |
Download Image: + Medium Size (Screen) + High Resolution (Original) You are currently viewing photo 55 of 102 in the Build Season - Week Six photo gallery. |
Since we wanted to run as few wires and hoses as possible up our elevator, we mounted the two pneumatic solenoids for are tetra manipulator on the joint of our arm. This way, we only needed to run a single air hose up to the joint. The second hose was merely a protective cover for the wires to control the solenoids. (If you look below the right hand solenoid, you can see the electrical wires emerging from the second air hose.)
Download the highest-resolution version of this photo.
Photo Information:
Size: 602.2 kb • 2272x1704
Date: February 22, 2005
Views: 89
Tags: arm • elevator • pneumatics • 2005 • buildseason • weeksix
Embed this Photo:
By using the HTML or BB (Bulletin Board) code snippets available below, you can post this image into your blog or forum. Typically when posting images in web forums, such as Chief Delphi, you need to use BB code.
| HTML: | <a href="http://www.team228.org/media/pictures/view/1047" title="2005 Build Season - Week Six - Robot Arm and Elevator"><img src="http://www.team228.org/gallery/26/slideshow/bds-55.jpg" alt="2005 Build Season - Week Six - Robot Arm and Elevator" /></a> |
| BB: | [URL=http://www.team228.org/media/pictures/view/1047][IMG]http://www.team228.org/gallery/26/slideshow/bds-55.jpg[/IMG][/URL] |

